Marquardt Water Line

Key Highlights:

  • Project County: Stark
  • Project Summary:  Hammontree performed the surveying and design of the 2,700 feet of 12 inch waterline and 100 feet of 8 inch waterline.  

 

Hammontree was hired by the City of North Canton to prepare construction plans for a waterline and road replacement on Marquardt Avenue between East Maple Street and 7th Street.  Hammontree performed the surveying and design of the 2,700 feet of 12 inch waterline and 100 feet of 8 inch waterline.  The project also involved replacement of the storm sewers and catch basins.

Services:

  • Design Services
  • Base Topographic Survey & Mapping
  • Preparation of Technical Specifications